Full-Height Glass Partition Systems
A full-height glass partition extends from the finished floor to a defined upper termination, such as a suspended ceiling, structural slab, soffit, or another project-defined upper condition. The type of upper termination affects how the partition is supported and connected to the building.
It remains a non-load-bearing interior partition, and the full-height label does not by itself establish acoustic, fire, or stability performance or automatic project approval.
Full-height means
• A wall extending to the defined upper termination
• A clearly defined ceiling or upper support condition
• Support and connections suited to the actual site conditions
Full-height does not mean
• A fixed or universal wall height
• A separate wall system
• Guaranteed performance or automatic project approval
Which SG System Should You Start With?
SG-40, SG-86, and SG-100 provide different starting points depending on the intended appearance and proposed wall requirements.
To choose which system to review in detail, check the wall height, wall elevation, glass or infill configuration, door opening, and connections to the ceiling, floor, and adjacent building surfaces.
Use these systems as starting points for choosing a configuration; their names do not represent fixed performance levels.
Which Glass Configuration Best Fits the Project?
Start with the required visual privacy, preferred appearance, and intended wall construction. Each option uses a different glass position, wall build-up, and approach to visual privacy.
Standard color: silver | 16, 25, or 50 mm slats | Manual rotary control | Electric tilt | Electric lift and tilt.
Confirm the wall elevation and building connections before finalizing the detailed configuration. These glass configurations do not, by themselves, establish acoustic or fire ratings or guarantee the performance of the complete wall assembly or installed system.
How Should the Wall Elevation Be Divided?
After choosing the glass configuration, define the module layout, pane divisions, final module, and visible joint details.
Key Dimensions
Wall Elevation Checklist
• Use a full-height pane where pane size, access, handling, and installation conditions allow.
• Add a horizontal division where required by the elevation design, transport, or site access.
• Resize the final module to fit the actual wall length.
• Review narrow corner and door-side modules separately.
What Does the Wall Connect to at the Top?
Identify the actual upper support condition before confirming the full-height wall configuration.
Structural Slab or Solid Ceiling
Gypsum Ceiling
T-Bar Ceiling
Open Ceiling
Before Confirming the Top Connection
The visible ceiling finish may not be the actual structural support for the wall. An allowance of approximately 10 mm applies only to minor local surface unevenness—not to deflection, settlement, movement, sloping surfaces, or unsuitable substrates.
Above-ceiling acoustic treatments and fire barriers should be reviewed separately for the project.

How Do the Floor and Side Conditions Affect the Wall Connection?
Confirm the finished floor level, supporting structure, and adjacent building surfaces before selecting the base and side connection details.
The 15 mm floor adjustment and 25 mm side adjustment serve different purposes and are not interchangeable. Neither is a general gap or a standard frame, channel, track, or module-joint dimension.
How Should the Door Opening Be Integrated into the Wall Line?
The door opening does not change the wall’s status as a full-height partition. It must be coordinated with the surrounding framing, wall elevation, door hardware, and bottom detail.
How the Door Opening Fits into the Wall
• The upper U-channel continues along the top of the wall line.
• At a standard threshold-free doorway, the bottom track stops at the opening.
• The standard door frame does not need to be fixed directly to the upper U-channel.
• The door frame and adjacent vertical framing provide the required connection and support around the opening.
• The area above the door may be completed with glass, a fixed transom, a solid head panel, or another framed configuration.
Door Bottom Conditions
• Standard hinged door: Coordinate the bottom detail with the door frame and surrounding wall construction.
• Floor-spring door: Provide a separate bottom detail and a suitable structural base within the floor for the floor spring.
Coordinate the hinges or pivots, door closer or floor spring, lock, handle, and bottom detail as one complete door assembly.
Conditions Requiring Additional Review
• Heavy, tall, or wide doors
• Unusual door proportions
• Non-standard door openings or door-bottom conditions.
Start Your Full-Height Partition Review
A preliminary review can begin with basic project information. Additional drawings and project requirements can be provided as the configuration is developed.
A complete BOQ, final elevation, shop drawings, or full set of connection details is not required to begin. The ceiling type can be confirmed later, but it must be defined before the ceiling and other building connections are finalized.